1. |
Plates & Sheets |
C-steels, Alloy Steels, Stainless steel plates, sheets, strips, corrugated sheets, Galvanized sheets, Be plates, plates for pressure vessels and Cryogenic application as per STD codes and Standards. |
2. |
Pipes/Tubes/Fittings |
lnspection of pipes and tubes of all kinds of materials, namely C. steels, Stainless steels, Alloy steels as per ASTM, ASME & API, Elbows, Bends, Reducers, Tees, Cross Tees, Flanges (plain, SORF, Weld Neck flanges, Sockets, Nuts & Bolts of all standard sizes and varieties. |
3. |
Bars & Sections |
Round, Square billets / bars of different kinds of materials, Drawn sections like l-beams, Channels, Angles etc. |
4. |
Castings |
Castings of Valve bodies, side pieces and other applications. |
5. |
Refractory / lnsulation Bricks |
lnspection, Testing of Refractory bricks and insulation bricks used in Boiler furnaces |
6. |
Wire Ropes, Chains |
lnspection of metallic wire ropes, Slings, Hooks, Deshackles, Polyropylene ropes. |
7. |
Forgings / Extruded Sections, Channels, Angles |
TPI of stores materials, purchased materials Material identification, Witnessing of test and clearance for use. |
8. |
Readymade Engg. ltems |
TPI of industrialvalves, Chain Pulley Blocks, Compressors, EUT / HUT Cranes. Forged and machined components, Safely valves, Control valves, lndustrial valves (Ball, Needle, Gate, Globe, Butterfly) |
9. |
Pressure Vessels |
Third Party lnspection of fabrication jobs as per lS, ASME DIN & BS codes / specifications from material's identification to load out stage inclusive of drawing review / approvals, job expediting. |
10. |
Heat Exchangers |
TPI of Heat Exchangers of SS & CS as per Codes & Specs & Clients approved drawings. lnspection of Tubes / Tube sheets, Tube to tube sheets weld joints, hydro test witnesses and certifications. |
11. |
Storage Tanks |
CS/ SS storage tanks of different capacities cap. 2.s KL to 1000 KL as per codes and specifications & as per clients approved drawings. |
12. |
Industrial Chimneys |
Chimney design, drawing, fabrication inspection, installation, Verticality inspection, stability analysis. Thickness measurements. |
13. |
Cooling Towers |
Inspection of FRP cooling towers. |
14. |
Glass & Rubber Lined Vessels |
Inspection and testing of Jacketed vessels with agitator assembly of material SS-310 L of different capacities. |
15. |
Agitors / Reactors |
Jacketed vessels with agitator assembly of material ss-316 L of different capacities, lined with glass, rubber being inspected and certified. |
16. |
Metallurgy & Failure Analysis |
Materials selection, inspection, testing & evaluation for the specified job through metallographic tests. Failure Analysis & Determination of materials inclusion ratings. internal Quality audit in respect of e. C. Systems of the company. |
17. |
Welding Engg. & Technology |
Preparation of WPS [Welding Procedure Specification] Approved & Qualification of WPS for PQR [Procedure Qualification Record] welders Training, Qualification & certification as per client's & Job requirements. [1G to 6 G & 6GR] Welder's approval for their use on actual job To deal with various other Welding sequence, Review of weld radiographs & testing of weld joints. |
18. |
Machinery & Equipment |
All industrial safety instruments i.e inspection of Machinery & Equipment (Including Inspection of Cranes, Lifting Equipment’s, and Forklift). |
19. |
Quality Audit & Site Supervision |
Visit to Client's Plant, Fabrication work shop to check the Quality control system, to improve upon them for enhanced to develop system for quality control for the job in. |
20. |
Instrumentation |
Inspection / Calibration of Valves, Flow indicators, Tl, Ll, PG, Switches. |